The Under Canvas company provides a unique opportunity for all-inclusive adventure glamping (glamorous camping). Established in 2009, the company has grown to include multiple luxury glamping resorts and customized events all over the country.
This project was designed using BIM technology. During the documentation process, IFC files were used for the data exchange. The architectural building model was first created in REVIT, then exported to RFEM to apply loads and complete the full structural analysis and design.
For a project in Rotterdam, ADS Ertner used IDEA CONNECTION to analyze a structural steel connection. This program calculates steel connections utilizing the CBFEM method, where each thin-walled cross-section is modeled with nonlinear material properties, nonlinear bolts, and nonlinear welds. In order to transfer loads, ADS Ertner needed to use blocks in the connection model. In IDEA CONNECTION, blocks are not easily integrated with thin-walled plates.
The picture shows only a segment of the entire arena. The structure includes a total of 67 load cases and 6 load combinations. The calculation time of all load cases is approximately 2.5 minutes (Pentium IV, 1.99 GHz, 512MB RAM).
In June 2023, a roof of the amphitheater of the Municipal Theater in Most was successfully completed. The membrane structure has been specially designed to provide protection from the sun and rain above the stage, while making the entire space a visual attraction. The author of the design is Carl Stahl & spol.; the calculation was carried out using the programs RFEM 5 and RWIND 2.
Since 2012, the city of Baku, the capital of Azerbaijan, has had a striking complex of high-rise buildings: the Baku Flame Towers. The construction consists of three towers, which have the shape of a flame with a maximum height of 623 ft. The flame shape, designed by HOK Architects, was inspired by the importance of fire for the town, as there is a high number of oil wells in the region.
The boiler supporting structure with a combustion chamber is used as the main stiffening element of the coal‑fired plant in Neyveli, Tamil Nadu, India.
The boiler supporting structure measures 100 ft x 100 ft x 406.8 ft and, together with the boiler roof arranged above, it has to withstand loads of about 50,706 t.
The Holy Mosque in Mecca is the biggest and most important Islamic mosque in the world. An additional floor has been built in the interior around the main sanctuary of the Kaaba. The project's name is “Mataf Extension”.
The continuous casting plant of the JSW ISPAT steelworks in India was extended by an additional level and completed by new plant components and stair towers. At the same time, the existing structure was reinforced to be able to absorb the additional weight of the new components as well as increased seismic loads.